Display Morehmmm, interesting.
lots of power storage? I think not! This works better before rain stopped solars, but it could still work.
I am not up to date with energy conversion mods, as it is quite fun to use oil and fuel from bc, but here goes.
Back when I used to feed 32EU/t into a converter for my quarry, (plenty enough power) I would set it up with around 64 solar panels. And enough storage for the production of 32 of them for during the day.
This way, during the day, a MFE would fill up with the excess power (as a batbox would be the power limiter ) then it would discharge during the night. Technically you only need 58 or so due to the day lasting longer than the night, but with rain affecting them now, you might need a few more, and a bit more storage.
A bigger pressing problem I would have if i were to do mining on that scale would be storage of everything. massive chests, and you should have automatic maceration and smelting set up, as you could then turn all the ingots into their bricks to save space, using the BC autotcrafting.
Well I run four Large Electric Engines which adds up to 160EU/t. 40EU/t is also used for lighting, add on 10% to both for losses due to cable length, 220EU/t used for quarry and lighting. Plus 128EU/t to the mass fab to use up scrap at the rate it's being generated by the 4 LEEs. So let's say 350EU/t.
I recently reconfigured my storage MFSUs to thre parallel stacks of 6 each for a total of 180MEU storage. A little simply math gives a total of 514000 ticks before power runs out - more than enough for twelve hours of operation or so? Combined with 8 reactors (no CASUC) at 120EU/t each that recharge the batteries at roughly 3x the output rate, lets me more or less continuously run quarry operations.
And you're right, massive storage has been required for the mineral output, as well as 'compression' efforts to turn bars into blocks every eight hours or so. Everything has been automated except the brick-block conversion and the reactors getting filled.
----
On the plus side, between making the initial post and this one, I have completed Phase 3 of my tower and mining operations and have enlarged the excavation to a pure 240x240, meaning Phase 4, endless perfectly arranged 60x60 quarries, can soon commence for, well, ever. Or until I get bored. In any case, I'm posting screen shots in the correct spot to do so, please check it out!