Currently I have a Nuke plant setup with 4 generators. Each generators
have 6 cores attached, Within Each one they are configured to run with 8
cells and they cycle so their is all ways two on. For a total
generation of 320 eu/tick.
Here is the setup
http://www.talonfiremage.pwp.b…rhq2zyvoyk5wqokqyh8escbwg
Currently my factory and mining operation with lights are draining almost at a equal rate.
During
the cool down I thought I could breed some cells by replacing the
empties with near depleted boosting it to almost 400 eu/tick...
If I place it right after the first cycle and configure it like this
Would
that work correctly?... The thought is that the switch to breeder cycle
will enable it to absorb the heat it is currently at. Currently I have
about 1 stack of uranium bars. They are replenishing about at half my
rate of consumption so I need to start breeding it.
Back to my breeder plan....