http://test.vendaria.net/index…CCCHCCHHUPHCCCUUCHCHCHCCH
Comments or concerns? .... Predictions? ; p
And what would you class this setup as?
http://test.vendaria.net/index…CCCHCCHHUPHCCCUUCHCHCHCCH
Comments or concerns? .... Predictions? ; p
And what would you class this setup as?
By definition its a mark 3, however if its properly water cooled there wont be a critical heat, so im gonna say
mark-2 1C
Its hot though you'll have a little cooldown.
Wouldn't run this thing too close to a wood house either.
its up and running, at least its a design I made to pop the cherry.
Probably switch to this one by Quartaroy:
http://test.vendaria.net/index…CCUCCUHCUCHCCHCCUUCCCHCCH
but we will see just running it through a simulated cycle B]
Replacing those reactor plates with coolants (srslywhy?) we get:
http://test.vendaria.net/index…CCCHCCHHUCHCCCUUCHCHCHCCH
Mk2, won't burn a thing. 6-chamberers doesn't melt stuff till like 13k heat
Edit: OR use this for like double efficiency and shorter CD (but 50% less output)
http://test.vendaria.net/index…CCHCCCCCCCHCHHCCCCCCCHCHC
About half way through the run I swapped out the reactor plates for them two coolant cells like you suggested, I was thinking to make the reactor a little more melting resistant with them in there, just incase.
And yes I love your 4 banger design, am digging a second quarry down to bedrock to place 4 reactors running together with that loadout in the bottom.
Right now I am just having some fun with my first reactor ; ]
Replacing those reactor plates with coolants (srslywhy?) we get:
http://test.vendaria.net/index…CCCHCCHHUCHCCCUUCHCHCHCCH
Mk2, won't burn a thing. 6-chamberers doesn't melt stuff till like 13k heat