I have an Issue with the LHE/large steam turbine:
https://i.imgur.com/H6rls4b.jpg
Im cooling down lava in the LHE, its working at its maximum output, so with 2000mb/s lava it should produce 80000mb/s of super heated steam. Those are outputed to 2 EV output hatches (40000mb capacity each).
Next to those output hatches are the input hatches of high pressure steam turbines, also EV. I use huge tungstensteel turbines in those, they are specified for 40000mb/s optimal flow and 120% efficency, which should result in 2400eu/t.
Attached to those turbines are normal turbines, also with EV hatches and tungstensteel turbines, they should produce 1200 eu/t and as much distilled water as is needed in the LHE.
I have IV output hatches on all turbines. As you can barely see there are 3 processing arrays behind one turbine pair, those host 14 MV centrifuges each to centrifuge all the lava, each one should consume 1120eu/t, so 2 are connected to the pressurised turbine, 1 to the normal turbine.
Now to the issues (those still happen when the setup ran for a few minutes):
1. The turbines are not producing enough power. The pressurised should supply 2 processing arrays, but its only enough for one, the other one shuts down after a few seconds. The third processsing array also only runs for a few seconds...
2. Im loosing distilled water. Not only once at startup, but for ever.
At first i had pipes between the LHE and the turbines, but that was a bottleneck, so i attached them directly to each other. Sadly the output hatches of the LHE still fill up to their maximum, so there is steam wasted. Since i cant look into the input hatch of the first turbine i dont know if it doesnt get transfered fast enough, or if the turbine is to slow processing it...