So I'm curious about how chunk loading affects long transmission lines. I'm contemplating building a line in which the generating station would theoretically unload at some point.
I figure I could use multiple spaced out MFEs to provide a segmented line that would eventually deliver power to the end (assuming the chunks are loaded periodically), but is that really necessary?
Do I even need to worry about chunk loading?