(May not really be the right forums, but I suppose it could be moved, I think this is the best location)
I would have added this to the breaker thread, except it is locked.
I would note that after blowing up two MFEs, a MFSU, 2 macerators, and a mass fabricator, along with making a hueg hole in my wall/basement (indirectly, since you cant really overload an MFSU) I realized an issue with the wiring paint system. Basically, you CANNOT have two adjacent cables not connect when placed, no matter what, because they are always black on placement. I would ask to be able to paint cables before placement, except I know why that is not doable (requires usage of the damage data, which is used by mineforge IIRC) (machines as well, except you cant paint them anyway)
So, I think the only solution to this is to "unplug" (using a chainsaw I guess) all the nearby power sources, and drain them all via stacks of batteries/crystals/Laptron crystals.
Any other ideas