- Official Post
100 hU from electric heat generator, 1 mb/t and 0 bar on the steam generator, a steam turbine + ejector upgrade and a condensator. You will receive distilled water on both turbine and condensator.
100 hU/t gen -> steam gen -> turbine -> condensator