So basically i just TMI'd a bunch of stuff to test if tin wire could handle so many solar panels, so i made it so it's 1/4 (minus 1 solar panel on the very top of the MSF) of the maximum potential and i got 1,332EU/T so if i built the entire Solar Panel Grid (which would lag to hell) you'd get a 5,329EU/T or 106,5280EU per second which translates a whopping 63,948,000 EU per day, obviously at the price of so much refined iron and framerate, anyway this was just something i wanted to test out
1/4 of the Complete Solar Grid
Testing of EU/T