Thanks everyone for answering my question, but since I am going to write an GT guide(not in english, maybe someday), I need to ask more questions xD
But some question are quite stupid though...
1.Assuming an e-net with an input 32V/1A, omitting all loss.
If I have 2 LV ore washing plant(16V) + another LV machine running on this e-net, no matter how large is your energy storage, machines will run into an not enough power error, right?
If the input changes to 32V/2A, then can the machines works continuously without an error?
2.P = I x V works in GT, right?
So if loss is omitted, you can run 32(or maybe 30) ore washing plant while using an 32V/16A input, right?
3.Is the battery buffer the only block that can adjust the output amperage? So the following setup does not output 2A, right?
----
........|------->----
4.What might be the best way to find ores that height is below than 40, like lithium? Still caving or mine a tunnel, or any other ways?